The countdown and your readiness
The first maintenance logbook is required in August 2028, and many condos are already preparing. Every job recorded today is a line that already exists in the file you will sign that day.
Law 16 requires a logbook of work every five years. You record the work; Edifice adds the cost, the Uniformat code and the fund. At the deadline, the export is ready.
Logging a job takes thirty seconds: what you saw and what it cost. Edifice fills in the Uniformat code, the fund, the period and the logbook line, because they all follow from the component.
The occupant reports the crack and you take the photo while the mason is there. It stays attached to the logbook line, with the date and the contractor.
The contractor’s cheque is recorded and split between reserve and operations the day you receive it, not rebuilt in April.
Type “elevator” and Edifice suggests D1090, Elevators. The Uniformat code Law 16 requires stays with the job through to the export.
Each line of the annual maintenance plan fills in as jobs are recorded. Whatever falls behind shows in red, long before the inspection.
As the deadline nears, the real question is not “do we have the logbook?” but “what is still missing?”. The coverage view answers that.
See how work is trackedEdifice tracks the maintenance logbook, the reserve fund study and the certificate at each unit sale, and how ready you are for each, not just the date. A component with no follow-up shows in red long before the engineer finds it.
The first maintenance logbook is required in August 2028, and many condos are already preparing. Every job recorded today is a line that already exists in the file you will sign that day.
The building inventory is checked against the logbook: guardrails never touched, fire doors last inspected in 2024, drainage forgotten. Once you can see a gap, you can close it.
Type “elevator” and the component appears with its Uniformat code. Each job is classified as it comes in, not the night before the export in a spreadsheet full of PDFs.
At export, each line carries its date, component, code, cost and fund. That is the file Law 16 describes, built from what you recorded, not from what you had to dig up.
For the full picture (logbook, study, certificate), read the Law 16 compliance page.
Law 16 requires the list of work on the common areas, its costs and how they are split, over five years. Edifice prepares that list line by line from what you record during the year. The administration signs the logbook, and a professional signs the reserve fund study.
Anything affecting common areas counts. The golden rule: if a contractor worked on the building, it goes in the logbook. Replacing a crank in a private unit does not.
Yes. Invoices, old logbooks, engineering studies: drop them into Documents. The AI agent reads them, and you can rebuild the history by asking questions rather than digging through boxes.
The building status certificate downloads pre-filled for each unit sale: condo fees, reserve fund, work in progress.
Gaps show up in red in the building inventory, well before the inspection. The logbook shows not only the entries that exist, but the holes too.
No. A professional still signs the study, as the law requires. Edifice keeps it with your documents: imported once, re-read by the AI agent, linked to your components and fund scenarios.
Record through the year, export at the deadline. The trial is 14 days, and we help you upload your documents.