Cyber Monday: 20% off your subscription.

--
DAYS
--
HOURS
--
MINUTES
--
SECONDS
Get the offer

Applies to your whole subscription, base price and extra doors, for 12 months. Code: VENDREDIFOU20

Maintenance logbook

The maintenance logbook that fills in as you work.

Law 16 requires a logbook of work every five years. You record the work; Edifice adds the cost, the Uniformat code and the fund. At the deadline, the export is ready.

On site. Take the photo while the mason is there. Edifice does the rest.

Logging a job takes thirty seconds: what you saw and what it cost. Edifice fills in the Uniformat code, the fund, the period and the logbook line, because they all follow from the component.

The photo on site

The occupant reports the crack and you take the photo while the mason is there. It stays attached to the logbook line, with the date and the contractor.

The cost, same day

The contractor’s cheque is recorded and split between reserve and operations the day you receive it, not rebuilt in April.

The code, without thinking about it

Type “elevator” and Edifice suggests D1090, Elevators. The Uniformat code Law 16 requires stays with the job through to the export.

Coverage. Where do you stand against the plan?

Each line of the annual maintenance plan fills in as jobs are recorded. Whatever falls behind shows in red, long before the inspection.

As the deadline nears, the real question is not “do we have the logbook?” but “what is still missing?”. The coverage view answers that.

See how work is tracked

Deadlines. Law 16 has dates. Your logbook shows what is missing.

Edifice tracks the maintenance logbook, the reserve fund study and the certificate at each unit sale, and how ready you are for each, not just the date. A component with no follow-up shows in red long before the engineer finds it.

The countdown and your readiness

The first maintenance logbook is required in August 2028, and many condos are already preparing. Every job recorded today is a line that already exists in the file you will sign that day.

Components with no follow-up stand out

The building inventory is checked against the logbook: guardrails never touched, fire doors last inspected in 2024, drainage forgotten. Once you can see a gap, you can close it.

The Uniformat codes. The classification the engineer asks for is already filled in.

Type “elevator” and the component appears with its Uniformat code. Each job is classified as it comes in, not the night before the export in a spreadsheet full of PDFs.

At export, each line carries its date, component, code, cost and fund. That is the file Law 16 describes, built from what you recorded, not from what you had to dig up.

5 years
from one logbook to the next, the Law 16 cycle
30
seconds to log a job
100%
of exported lines carry their Uniformat code
No
spreadsheet to rebuild at year end

Questions. The logbook, in questions.

For the full picture (logbook, study, certificate), read the Law 16 compliance page.

Is the Edifice logbook enough for Law 16?

Law 16 requires the list of work on the common areas, its costs and how they are split, over five years. Edifice prepares that list line by line from what you record during the year. The administration signs the logbook, and a professional signs the reserve fund study.

Do I need to record every small repair?

Anything affecting common areas counts. The golden rule: if a contractor worked on the building, it goes in the logbook. Replacing a crank in a private unit does not.

Can I import the history from past years?

Yes. Invoices, old logbooks, engineering studies: drop them into Documents. The AI agent reads them, and you can rebuild the history by asking questions rather than digging through boxes.

Can the notary receive the certificate directly?

The building status certificate downloads pre-filled for each unit sale: condo fees, reserve fund, work in progress.

What if nobody records anything for a year?

Gaps show up in red in the building inventory, well before the inspection. The logbook shows not only the entries that exist, but the holes too.

Does the logbook replace the reserve fund study?

No. A professional still signs the study, as the law requires. Edifice keeps it with your documents: imported once, re-read by the AI agent, linked to your components and fund scenarios.

Read next

Your logbook, ready before the deadline.

Record through the year, export at the deadline. The trial is 14 days, and we help you upload your documents.