From request to close, every job leaves a record.
An occupant’s request becomes a work item. It gets a contractor, photos, a Uniformat code and a fund split, then it closes, and its line goes into the maintenance logbook.
The request. An occupant’s request becomes a job to follow.
Sort
Each ticket is sorted before it becomes a job, and its photos can follow it.
Assign
You pick the contractor or technician, with start and end dates.
Follow
The job moves from Open to In preparation, In progress, then Closed. Each card shows the contractor, the Uniformat code and the payment.
On site. Everything is noted while the contractor is there.
Photos, on the spot
Take them during the work: they stay attached to the logbook line, with the date and the contractor.
2 photosA Uniformat code, without thinking
Type “elevator” and Edifice suggests D1090, Elevators. The code Law 16 requires follows the job.
D1090Every payment, split across the funds
A payment is split between the reserve fund and the operating fund, and the split has to equal the amount paid.
$14,000 + $1,000
The close. The job closes and its line goes into the logbook.
Rate the contractor
Before closing, you rate communication, price, quality and punctuality, and say whether you would hire them again.
One file per contractor
A contractor’s documents, payments and jobs, in one place.
A logbook that fills itself
What you record during the year becomes the maintenance logbook, line by line.
Also. The rest of the tracking.
A maintenance calendar
Planned work shows on the calendar by type: preventive, repair or inspection.
A cost summary
The total quoted, the budget with contingency, the amount paid to date and the gap, on every job.
A plan to the horizon you choose
Planned expenses show up in the reserve fund plan, scenario by scenario.
Questions. The ones we hear most.
What happens when an occupant reports a problem?
The ticket arrives in Edifice. You sort it, then create a work item, with the original photos if you want, and assign a contractor or a technician.
Do I need to log every small repair?
Anything touching the common areas counts. If a contractor worked on the building, it is a line in the logbook. Replacing a crank in a private unit is not.
Can I import the history of past years?
Yes. Invoices, older logbooks and engineering studies go into Documents. The AI agent reads them, and you can rebuild the history by asking questions instead of digging through boxes.
Does the logbook replace the reserve fund study?
No. The study is still signed by a professional, as the law requires. Edifice keeps it on file, linked to your components and fund scenarios.
What if nobody logs anything for a year?
Gaps show up in red in the building inventory, well before the inspection. The logbook shows the holes, not only the lines that exist.
Try Edifice free for 14 days.
Add your building, your contractors and your first job. The price is $50 per building per month, with 100 doors included.




